Uttar Hansa(Ailer Road), Gobindapur,Faridganj,Chadpur
Total construction cost foundation to 1st floor = 18,46438 taka Total construction cost 1st floor to 2nd floor = 644125+582339=12,26464 taka Total construction cost 2nd floor to 3rd floor = 644125+582339=12,26464 taka Total material cost =42,99366 taka Average materials cost =14,33122 Average cost per area =1433122/ 1345 =1065 taka sft